Buildings: Synchronize Manually

The entire Tracer ES database automatically synchronizes with all buildings once per week or other interval configured in the System Parameters page. Additionally, you should manually synchronize a building any time you suspect or know that changes were made using a different tool, such as Tracer Summit.

To manually synchronize individual buildings:

  1. Go to Home.
  2. Click All Buildings.
  3. Select the buildings you want to synchronize.
  4. Click Advanced.
  5. Click Synchronize Now.

Related Topics