The entire Tracer ES database automatically synchronizes with all buildings once per week or other interval configured in the System Parameters page. Additionally, you should manually synchronize a building any time you suspect or know that changes were made using a different tool, such as Tracer Summit.
To manually synchronize individual buildings: